We are delighted to return to the EnscoRowan 72 jack-up rig to begin the annual Ex inspection and complete the IRT survey under higher loading, (that originally began during April at the Hartlepool AbleUK dock).
Both PM inspections types are to begin this week, (week 21). Our inspectors are to depart from Norwich, while the EnscoRowan rig begin its 3 well contract for Petrofac in the southern Sector of the North Sea.
Both IRT and Ex inspections are required under EnscoRowan’s annual rig PM program, and used to hightlight and implement corrective actions on found electrical deficiencies that may result in power outages if left unattended.